Application status of T-connection technology for 35kV transmission line and research on T-connection technology of cross cross arm
Konferenz: ECITech 2022 - The 2022 International Conference on Electrical, Control and Information Technology
25.03.2022 - 27.03.2022 in Kunming, China
Tagungsband: ECITech 2022
Seiten: 5Sprache: EnglischTyp: PDF
Autoren:
Gong, Shijie; Li, Chu (Stata Grid Hebei Economic Research Institut, Shijiazhuang, Hebei, China)
Inhalt:
With the rapid development of economy, people have higher and higher requirements for power reliability. In the current construction of 35kV transmission lines, in order to solve the problem of insufficient power supply reliability, there are more and more projects to transform the existing lines to increase access power supply. This paper introduces the application status of T-connection technology for 35kV transmission line and designs the head part of T-connection tower with cross cross load.