Part 12: Application guidelines for LCC HVDC converter stations
(IEC 60071-12:2022); German version EN IEC 60071-12:2022 Class/Status:
Standard,
valid
Released: 2023-12
VDE Art. No.: 0100755
This standard applies guidelines on the procedures for insulation co-ordination of line commutated converter (LCC) stations for high-voltage direct current (HVDC) project, whose aim is to give guidance for the determination of the specified withstand voltages for equipment. The content of this document strictly follows the flow chart of the insulation co-ordination process and give detailed information on the concepts governing the insulation co-ordination process which leads to the establishment of the specified withstand voltage levels. This document emphasizes the necessity of considering, at the very beginning, all origins, all classes and all types of voltage stresses in service. At the end of the process, when the selection of the specified withstand voltages takes place, does the principle of covering a particular service voltage stress by a specified withstand voltage apply. The annex contains examples of insulation co-ordination for conventional HVDC converters which support the concepts described in the main text, and the basic analytical techniques used.
This Document is related to the following Topics (in bold):
We use cookies on our website. Some are necessary, while others help us to improve website performance
and are used to provide personalized advertising.
For more information, please see our
data protection policy.
Individual Cookie Settings
Necessary Cookies
cookie_consent (Validity: 1 year)
PHPSESSID (Temporary, is removed when the browser is closed)
Optional Cookies
_gcl_au (Validity: 90 days)
_uetvid (validity: 30 days) - Stores a unique visitor ID for tracking user interactions.
_uetsid (validity: 30 minutes) - Saves a session ID for tracking the current visitor session.