Research on virtual power plant participating in ancillary services market for peak regulation and reserve market
Conference: ECITech 2022 - The 2022 International Conference on Electrical, Control and Information Technology
03/25/2022 - 03/27/2022 at Kunming, China
Proceedings: ECITech 2022
Pages: 8Language: englishTyp: PDF
Authors:
Cai, Shengqi (State Grid Shanghai Municipal Electric Power Co., Shanghai, China)
Liu, Chuang; Bao, Tie; He, Lei; Xiao, Wang; Liu, Yang (State Grid Electric Power Research Institute Co., Ltd, Nanjing Jiangsu, China & Beijing Kedong Electric Power Control System Co., Ltd, Beijing, China)
Abstract:
To fully explore the ability of the virtual power plant (VPP) to participate in the ancillary service market, a clearing model for the VPP to participate in peak regulation and reserve ancillary service market has been proposed. The data matrix is established by the power grid model data and user declaration data. The clearing model is solved by using the linear programming method with bid-winning power and phase difference as decision variables and optimal income as an objective function. Finally, the example analysis verifies that the model of this paper can effectively obtain the power and marginal clearing price of each unit.